
Kajima - Hoa Binh handed over Aeon Mall Ha Dong project earlier than the plan
news
After 25 months of construction, Kajima - Hoa Binh general contractor has just handed over AEON MALL Ha Dong to AEONMALL Vietnam in order to launch this shopping mall.
On 05/12/2019, AEON MALL Ha Dong was officially opened. This is the largest shopping mall of AEON Group in Vietnam, invested by AEONMALL Vietnam Limited Company. Kajima - Hoa Binh Joint Venture is the general Design and Build (D&B) contractor. The construction time is 25 months.
With the super-fast construction speed of the contractor, Aeon Mall Ha Dong was opened and put into operation.
AEON MALL Ha Dong shopping mall includes 1 basement, 1 ground floor, and 3 floors with total construction area of more than 150,000 m2. This is one of the projects which Kajima - Hoa Binh general contractor has constructed with super-fast construction speed.
Mr. Le Viet Hai – Chairman cum CEO of Hoa Binh (the second one from the right) is performing the opening formality.
With its eco-friendly green design and modern technology, AEON MALL Ha Dong is considered as one of the largest shopping malls in Vietnam, and an ideal destination in the West of Hanoi.
Tin liên quan

Hòa Bình bàn giao đúng tiến độ giai...
Sau hơn 7 tháng thi công, Tập đoàn Xây dựng Hòa Bình đã thực hiện bàn giao đúng tiến độ giai...

Tái khởi động dự án Khu phức hợp...
Sáng 23/9/2021, dự án Khu phức hợp Sóng Việt – The Metropole Thủ Thiêm đã chính thức tái khởi...

Hòa Bình cất nóc vượt tiến độ dự...
Ngày 25/10/2022, Tập đoàn Xây dựng Hòa Bình đã tổ chức cất nóc dự án VinHomes Grand Park Phân...